  1) Information on works on elimination (former) natural dam on the Bureya River.
  
  
  "https://portamur.ru/news/detail/k-mestu-opolznya-na-buree-dostavili-burovuyu-ustanovku-i-pogruzchik/
  
  To the place of a landslide on Bureya delivered the drilling rig and the loader
  
  Military executed seven blastings on a channel
  
  Yesterday, 19:49
  
  To the place of the landslide on the Bureya army helicopters delivered a front loader and drilling rig on the basis of KAMAZ, which will make deep holes in the rock for the charges...
  
  As the press service of the Ministry of Defence reports, seven explosions were made on the duct [channel] are executed. The length of the channel about 200 meters, depth - 20 meters, width - 35 ..." [https://portamur.ru/news/detail/k-mestu-opolznya-na-buree-dostavili-burovuyu-ustanovku-i-pogruzchik/]
  
  
  
  "https://www.khabkrai.ru/events/news/172910
  
  Official site of the Government of Khabarovsk Krai
  
  Today on February 05, 2019 1:46:33 AM
  
  Updated 7 hours ago
  
  On the Bureya River the second stage of operation on elimination of a landslide began
  
  February 04, 2019
  
  Verkhnebureinsky district
  
  Engineering troops of the Ministry of Defence of the Russian Federation started the second stage of operation on elimination of the blockage which partitioned off the bed of the Bureya River. At the end of the last week experts punched the channel of 20.5 meters in depth on which water went. Now the channel should expand by the military to restore the water mode.
  
  Capacity channels is about 600 cubic meters a second. Length of the channel - about 260 meters, width - 42 meters. The breed fragments which remained after explosions remove by means of heavy machinery. The water level in the reservoir began to level off...
  
  ... At the request of the governor the appeal which was transferred to three ministries at once - the ministry of construction of the Russian Federation, the Ministry of Finance of the Russian Federation and to the Ministry of Emergency Situations for preparation of the expert opinion is sent to the Government of the Russian Federation suitably. According to preliminary estimates, on resettlement more than 300 million rubles will be required.
  
  Press service of the governor and government of Khabarovsk Krai" [https://www.khabkrai.ru/events/news/172910]
  
  
  
  "http://vestidv.ru/news/19/02/04/26282
  
  On February 04, 14:35
  
  New explosions on Bureya ...
  
  Andrey Kozlov is the head of department of railway troops of the Eastern Military District
  "Now by forces of engineering troops we start broadening and the most important to deepening of a bottom of the channel to a necessary mark that we had the steady speed of the movement and rather large volume of water that will pass through this proran"
  
  It is planned to complete these works by February 18.
  
  Tatyana Shevchuk
  
  "Far East" State TV and Radio Broadcasting Company
  Online media "State Internet channel Russia 2001 - 2019. Mass media registration certificate Al No. FS 77-59166 of August 22, 2014 ..." [http://vestidv.ru/news/19/02/04/26282]
  
  
  
  2) The addition to data on dynamics of a situation on (former) natural dam, (former) spontaneous reservoir and adjacent territories.
  
  
  
  "http://voda.mnr.gov.ru/activities/detail.php?ID=545175
  
  Water management situation in the territory of Russia for February 04, 2019.
  
  Operational information about a water management situation in the territory of the Russian Federation
  
  Date of publication on the website: On February 04 2019 (14:20)
  
  According to messages of the organizations, Roshydromet and Emercom of Russia subordinated to Rosvodresursy for the past day there was the following water management situation:
  
  ...
  
  Khabarovsk Krai ...
  
  Military engineers of the Eastern Military District (EMD) carried out large-scale blastings a layer of rocky breeds on the Bureya Reservoir.
  
  01.02.2019 the channel is punched and hydraulic connection between the cut off part and main part of the reservoir is established. Now the military personnel of summary group Russian Defense Ministry will see off the work on expansion equipped channel with method of blastings by cumulative charges.
  
  The soil released after blastings and breed is carried away by a current to the Bureya Reservoir.
  
  Length of the channel in the place of a collapse of the rock is about 200 meters and 35 meters wide. Capacity channels (expense) is about 600 cubic meters a second.
  
  Amur region ...
  
  As of 04.02.2019 level ... in Bureya [reservoir] - 246.55 m of BS ..." [http://voda.mnr.gov.ru/activities/detail.php?ID=545175]
  
  [As of 01.02.2019 - 246.85 m of BS. In the situation of the functioning hydroelectric power station].
  
  
  Comment:
  
  Some of the circumstances attract more attention. In the message of FAWR of February 01, 2019, it was said about the flow rate of "water in the channel 8 cubic meters / s."
  
  The FAWR report of February 4, 2019 states:"the flow capacity (flow rate) is about 600 cubic meters per second."
  
  In addition, in (numerous) publications there is no mention of any significant wave formed after the restoration of the hydraulic connection between the two parts of the Bureya Reservoir.
  
  Consequently, it can be assumed that the equalization of water levels in both parts of the Bureya reservoir occurred (occurs) gradually, without the formation of any significant (high and powerful) wave.
  
  If this assumption corresponds to the truth, then such result of works - restoration of hydraulic communication between two parts of the Bureya Reservoir without formation of a significant wave - can be considered one of the major positive results of the performed drilling-and-blasting works (for restoration of the normal hydrological mode of the Bureya Reservoir).
  
  
  
  "https://tvzvezda.ru/news/forces/content/2019241754-vMZWG.html?utm_source=yxnews&utm_medium=desktop
  
  Big water: sappers expanded to a channel in the place of the rock collapse on the Bureya Reservoir
  
  Konstantin Hudoleev
  
  18:13 04.02.2019
  
  Since the beginning of a demolition work on the Bureya River more than 200 tons of TNT are used and about 460 sets of cumulative charges are undermined.
  
  ... Despite a thick ice armor, in the man-made lake water level began to fall. Speed of its falling - about three centimeters a day. To accelerate this process, sappers continue blastings charges ..." [https://tvzvezda.ru/news/forces/content/2019241754-vMZWG.html?utm_source=yxnews&utm_medium=desktop]
  
  
  
  3) Additional information
  
  
  
  " https://www.amurobl.ru/posts/news/oblastnye-spasateli-prodolzhayut-obespechivat-bezopasnost-na-bureyskom-vodokhranilishche/
  
  ...
  
  Regional rescuers continue to ensure safety on the Bureya Reservoir
  
  Date of placement: 04.02.2019 17:06
  
  Date of change: 04.02.2019 17:08
  
  On the place of a landslide military continue works on expansion of the channel on the Bureya River. They are helped also by aircrafts which deliver to the venue of works the necessary equipment, food and fuels and lubricants. The Mi-8 helicopter and the TVS-2 plane of the Amur air base work in Khabarovsk Krai since January 18 ...
  
  In total for last period the plane flew 11.50 hours, the helicopter - 27.35 hours ...
  
  In last days off there was a change of group of rescuers - approximately, their business trip will last till February 18.
  
  љ 2001-2019, Government of the Amur region" [https://www.amurobl.ru/posts/news/oblastnye-spasateli-prodolzhayut-obespechivat-bezopasnost-na-bureyskom-vodokhranilishche/]
  
  
  
  4) Brief chronological information.
  
  
  
  December 12, 2018. In a zone of the Bureya Reservoir there was a descent of rocky soil to overlapping of the bed of the Bureya River around merge to the Sredny SandarRiver (the Middle Sandar River). [http://voda.mnr.gov.ru/activities/list.php?part=17] [http://planet.iitp.ru/news.html]
  
  December 21, 2018. Alexander Markanov and Anatoly Ivanov left on hunting to the Verkhnebureinsky Region of [Khabarovsk Krai] and found out that across the bed of the Bureya River the big heap of stones, the earth and trees appeared. The top of one of hills was demolished. [https://www.dvnovosti.ru/khab/2018/12/25/92975/]
  
  On January 10, 2019 "In Verkhnebureinsky MR of [Khabarovsk Krai] the emergency regime (the decision of the head of the district of 09.01.2019 No. 2) is introduced." [http://voda.mnr.gov.ru/activities/list.php?part=17]
  
  January 10, 2019. The publication (of January 10, 2019) on the Internet:
  "Russian Defense Ministry; Original @mod_russia account
  At the request of the President of Russia Vladimir Putin of force and means of the Russian Defense Ministry are used for clearing of the river course and carrying out drilling-and-blasting works for restoration of the normal hydrological mode of the Bureya Reservoir" [https://twitter.com/mod_russia/status/1083574220213358593].
  
  January 13, 2019. "January 13, 2019 08: 57"The camp with tents and a field kitchen has already been set up near the reservoir " [https://www.vesti.ru/doc.html?id=3103926&cid=8]
  
  January 13, 2019. "on January 14, 15:52. On Wednesday the governor of Khabarovsk Krai Sergey Furgal visited the place of the landslide in Verkhnebureinsky district" [https://ria.ru/20190116/1549437454.html]
  
  January 17, 2019. In the territory of the Bureya region [of Amur region] the emergency regime (the decision of the head of the district of 17.01.2019 No. 14) is introduced. [http://voda.mnr.gov.ru/activities/list.php?part=17]
  
  January 19, 2019. In borders of the Verkhnebureinsky Region of [Khabarovsk Krai] the emergency regime of regional character (the resolution of the governor of Khabarovsk Krai of 19.01.2019 No. 38-rp) is introduced. [http://voda.mnr.gov.ru/activities/list.php?part=17]
  
  January 22, 2019. "The Metropolitan of Khabarovsk and Priamurie Artemy by helicopter arrived on January 22 in Verkhnebureinsky district" [https://todaykhv.ru/news/incident/18074/]
  
  On January 22, 2019 "... The Deputy Minister of Defence of the Russian Federation Dmitry Bulgakov arrived on January 22 to the Bureya Reservoir..." [https://tvzvezda.ru/news/forces/content/201901220824-qbqi.htm]
  
  On January 24, 2019 "In this flight the crew came very close to the extreme take-off mass of the transport helicopter Mi-26. Unique flight was made by pilots of army aircraft of the Eastern Military District by heavy transport helicopter Mi-26. They transported from Ukrainka air base up to the river bank Bureya the 20-ton bulldozer. In this flight almost maximum take-off mass of this helicopter - 56 tons was reached. It was necessary to sit down on the small platform on the river bank. The task is carried successfully out ... Earlier helicopter pilots delivered a tanker truck fuel-servicing truck to the place of a landslide." [https://tvzvezda.ru/news/forces/content/201901241719-28k3.htm]
  
  On January 28, 2019. "- Several pieces of equipment have passed to the place of blockage by winter road. Military struck [created] the road in the forest with a length of 75 km from the station Ushman to the mouth of the Chelpachi river for four days. Just amazing speed, - the head of Verkhnebureinsky district Alexey Maslov says."[https://todaykhv.ru/news/incident/18166/]
  
  On January 29, 2019. "The dirt road was paved to the location of the explosions from the field camp along the crest of the [natural] dam " [https://asn24.ru/news/crime/59222/]
  
  On January 31, 2019 "on January 31 the governor of the Amur region Vasily Orlov flew by helicopter for Khabarovsk Krai, to the place where on Bureya the hill slope collapsed [where the landslide was ]" [http://www.teleport2001.ru/news/2019-01-31/108115-gubernator-vasiliy-orlov-otpravilsya-k-mestu-zagadochnogo-opolznya-na-reke-buree.html?utm_source=yxnews&utm_medium=desktop]
  
  February 1, 2019. "Today, the soldiers completed the first stage of the rock explosion, which divided the Bureya reservoir into two pools. This was reported by Deputy defense Minister, the Hero of Russia, army General Dmitry Bulgakov during a trip to the place of events."[https://tvzvezda.ru/news/forces/content/201902010706-8huz.htm]
  
  February 1, 2019. "01.02.2019 the channel is punched and hydraulic connection between the cut off part and main part of the Bureya reservoir is established" [http://voda.mnr.gov.ru/activities/detail.php?ID=545145]
  
  On February 2, 2019 "The Bureya hydroelectric power station came to the mode of normal work" [https://tass.ru/proisshestviya/6071841]
  
  
  February 4, 2019 .20:27
  
  
  Translation from Russian into English: February 4, 2019 20:36.
  Владимир Владимирович Залесский "Рассказ об интересе к Бурейской теме вечером 4 февраля 2019 г."
  
 Ваша оценка:

Связаться с программистом сайта.

Новые книги авторов СИ, вышедшие из печати:
О.Болдырева "Крадуш. Чужие души" М.Николаев "Вторжение на Землю"

Как попасть в этoт список
Сайт - "Художники" .. || .. Доска об'явлений "Книги"